M6 Ash Flats footpath work

Theresa Morley

Work to replace the footpath, making it safer for pedestrians to use. To carry out this work safely, we’ll need to fully close Ash Flats Lane for the duration of the work. For more information on roadworks, please check the … Read More

M60 junction 10 to M62 junction 18 resurfacing

Theresa Morley

With motorists now experiencing the benefits of the fully-operational Manchester smart motorway, we are resurfacing M60 junction 10 to M62 junction 18 overnight to reduce the need for further maintenance. For more information on these roadworks, please check the Roadworks … Read More

A5 Atherstone: Mancetter roundabout to Long Street junction

Theresa Morley

Work to lower the carriageway under the three bridges between Mancetter roundabout and Long Street junction. This work is required to create extra room for tall vehicles to pass underneath. The works will be carried out overnight when there are … Read More

A47 Dereham to Norwich

Theresa Morley

The following works will be carried out between Dereham and Norwich: renewal of road lining, markings and studs renewal of high friction surfacing Diversion routes Drivers heading west from the A47 take the A11 and head towards Thetford at the … Read More

A1 Sibson to Wansford to Stamford resurfacing

Theresa Morley

The following works will be carried out: surveys road surface improvements vegetation clearance footway treatments refreshment of road markings and road studs installation of sign posts, traffic count loops and a vehicle restraint system We are aware the affect traffic … Read More

A47 Wisbech works

Theresa Morley

The following works will be carried out: renewal of road markings and studs carriageway repairs Diversion routes Drivers heading west at the A47 / B198 Lynn Road roundabout take the third exit on to the B198 and follow at the … Read More

A1 / A428 junction at Wyboston Flyover repair

Theresa Morley

A series of overnight closures from 16 July to mid October at this junction to repair the flyover. Diversions will be clearly signed. For more information on roadworks, please check the Roadworks finder.

M602 Clarendon footbridge maintenance

Theresa Morley

Works need to be carried out to repair the Clarendon footbridge. Puddles have been forming on the bridge when it rains, so it needs to be closed for four weeks, from Monday 30 July, to carry out repairs.

A5 Towcester High Street

Theresa Morley

We will be carrying out essential maintenance work on the A5 from the road bridge over the River Tove southbound towards the junction of the A5 with Marlow Road, Towcester. During this comprehensive scheme of work, we will undertake extensive … Read More

A11 Fiveways roundabout signalisation

Theresa Morley

Installation of traffic signals on the approaches to the A11 Fiveways roundabout from A11 north, A11 south and A1101 west. Other works will also be carried out, which will include: reducing the speed limit to 40mph on the A11 southbound … Read More

A47 junction 17 to junction 19 resurfacing

Theresa Morley

Works will include road surface improvements including installation of anti-skid surfacing, refreshment of road markings and road studs. Works will be carried out overnight on weekdays only. Closures will take place as below (dates subject to change): Eastbound closure of … Read More

M42 junction 7a safety barrier replacement

Theresa Morley

Installation of sections of new safety barriers on the M42 at junction 7a. This work is part of Highways England’s continuing investment in the network. The replacement of the existing central barrier will help to create safer journeys for all … Read More

M42 junction 3a to junction 7a: safety barrier renewal

Theresa Morley

Work to renew the safety barrier to improve safety for road users. Works will be carried out overnight. During the day the carriageway will be kept open as usual. There will be sections of the M42 with overnight lane 2 … Read More

M1 Tinsley Viaduct bridge maintenance

Theresa Morley

A range of maintenance and improvement work will be carried out to Tinsley Viaduct, including: replacing around 2.5 miles of safety barriers waterproofing the steel structure putting down 20,000 square metres of resurfacing improving just over a mile of footpath … Read More

A404 Marlow footbridge refurbishment

Guy Harrington

Work to the footbridge which crosses over the A404 near Marlow in Buckinghamshire, which will involve refurbishing the staircases and applying a new paint to the steel elements of the structure which will protect it from corrosion and extend its … Read More

A1(M) Ripon to Leeming Bar resurfacing

Guy Harrington

We’ve identified a 16km stretch of the A1(M) northbound carriageway between Ripon and Leeming Bar that is reaching the end of its serviceable life and is in need of resurfacing. Diversions The diversion for north and south closures of the … Read More

M180 junctions 1 to 2 barrier replacement

Guy Harrington

Work to replace the existing steel barrier in the central reserve with new concrete barriers, replace steel safety barriers next to the verge, mainline carriageway resurfacing and improvements to road drainage. Work will also involve resurfacing of the westbound entry … Read More

A1 southbound between Harlaxton and Stamford: resurfacing

Guy Harrington

Work includes resurfacing and refreshing the road markings on the A1 between Harlaxton and Stamford. We’ll carry out this work overnight when we’ll need to close the carriageway between the A607 at Harlaxton and the A606 at Stamford. Check our … Read More