A38 Harcombe Cross to Haldon drainage scheme

Theresa Morley

Works to repair and upgrade drainage. Some resurfacing works will also take place. For more information on roadworks, please check the roadworks calendar.

M25 junction 23

Guy Harrington

The project aims to increase capacity at junction 23 of the M25. The project aims to increase capacity at junction 23 of the M25. For latest updates on closures, and traffic conditions on England’s motorway and major roads network visit … Read More

M18 junction 1 to junction 7 resurfacing

David Coxon

For latest updates on closures, and traffic conditions on England’s motorway and major roads network visit For latest updates for roadworks on England’s motorway and major roads network visit We are resurfacing the M18: We will carry out the work … Read More

A585 Norcross roundabout

Theresa Morley

Plans to increase the size of the roundabout, widen the approaches to the junction and install traffic signal controls. Signal controlled pedestrian crossings will also be introduced. Plans to increase the size of the roundabout, widen the approaches to the … Read More

A1(M) Vigo Railway

Scott Gaskin

We are installing a tunnel liner under the existing A1 motorway bridges and realigning the cycleway in Chester le Street. For latest updates on closures, and traffic conditions on England’s motorway and major roads network visit For latest updates for … Read More

A500 – average speed camera installation

Theresa Morley

We’re working to install average speed cameras along the A500 from M6 junction 15 and along the A500 Queensway. These cameras should help to make the road safer by reducing congestion caused by incidents and smooth out traffic flow. The … Read More

M42 junction 3 improvements

John Simpson

Work to ease the congestion at peak times. To do this, we will be installing a dedicated lane from M42 westbound to the A435 southbound. We will also be widening the slip roads and creating an extra lane on sections … Read More

M621 junction 6 to 7 central reserve safety barrier

Theresa Morley

Work to replace the existing steel central reserve barrier with a concrete barrier on the M621 and resurface in both directions to provide a safer network and smoother journey for all users. We will only work on one side of … Read More

M6 Carlisle North Package

Theresa Morley

A package of improvement work on the M6 north of Carlisle in spring/summer 2019. A package of improvement work on the M6 north of Carlisle in spring/summer 2019. For latest updates on closures, and traffic conditions on England’s motorway and … Read More

M25 junction 8: junction improvement

Theresa Morley

Improving junction 8 of the M25. Improving junction 8 of the M25. For latest updates on closures, and traffic conditions on England’s motorway and major roads network visit For latest updates for roadworks on England’s motorway and major roads network … Read More

A616 Park Lane, Tankersley carriageway widening

Guy Harrington

Work to provide a right-turn lane and pedestrian crossing point on the A616/Park Lane junction to improve safety at the junction. The scheme also includes widening of the carriageway, relocation of safety barrier, lighting and speed camera, drainage improvement, carriageway … Read More

M56 Sharston Bypass carriageway surfacing

Theresa Morley

Improving the M56 between junctions 1 and 3a. Improving the M56 between junctions 1 and 3a. For latest updates on closures, and traffic conditions on England’s motorway and major roads network visit For latest updates for roadworks on England’s motorway … Read More

A63 Roger Millward Way roundabout improvements

Theresa Morley

Works to put new traffic signals on the roundabout and build two new lanes through the middle of the roundabout. The new ‘hamburger’ style layout will mean that traffic can pass through the roundabout when travelling east or west. The … Read More

A63 Melton to South Cave westbound resurfacing and associated work

Guy Harrington

Work to resurface the A63 mainline carriageway westbound between Melton and South Cave junctions to address surface defects, providing drivers and local residents with a smoother and quieter road surface. Resurfacing work will also be carried out at the following … Read More

M62 junctions 33 to 34 verge safety barrier installation

Theresa Morley

Work to install new sections of steel barrier in the eastbound and westbound verges to improve safety between junction 33 (Ferrybridge) and junction 34 (A19 Selby junction). The scheme will also include improvements to verge drainage and maintenance. There will … Read More

A30 Crooked Billet roundabout

Theresa Morley

Proposed improvements to reduce congestion, queuing traffic and journey delays during peak hours at the Crooked Billet roundabout. Proposed improvements to reduce congestion, queuing traffic and journey delays during peak hours at the Crooked Billet roundabout. For latest updates on … Read More

A23 Brighton Road Hooley improvements

Theresa Morley

Proposed scheme to improve congestion and safety on the A23 Brighton Road, Hooley, Surrey. Proposed scheme to improve congestion and safety on the A23 Brighton Road, Hooley, Surrey. For latest updates on closures, and traffic conditions on England’s motorway and … Read More