Manchester North West Quadrant

Investigating the case for a wide range of improvements on the North West quadrant of the M60 between junctions 8 and 18.

Region:  North West
Start date:  TBC
Cost:  TBC
Status:  PLANNED
Type:  Major Scheme
End date:  TBC
Programme:  

Progress report

The Manchester North West Quadrant (MNWQ) was one of six strategic studies set out in the Department for Transport’s (DfT) first Roads Investment Strategy (RIS) in late 2014.

The MNWQ strategic study investigated a number of solutions for road, rail and bus to relieve pressure on the M60 between junctions 8 and 18. This is to ensure the area’s economic growth potential is not constrained and that sufficient transport capacity is provided. For more information, please visit Road Investment Strategy: post 2020 – Manchester North West Quadrant.

Since then, we have been tasked by the Department for Transport to carry out further design, analysis and environmental assessment of the potential improvements for the strategic road network. This project builds on the improvements which have already been made between M60 junction 8 and M62 junction 20 (Manchester smart motorway) and which became fully operational in July 2018.

What's next?

Using the extensive information gathered, we are looking at ways to reduce congestion and future proof the road, considering benefits and potential impacts on motorists, the environment, our neighbours and the economy. We’ll then identify a shortlist of options we believe will tackle the issues, before consulting with the public.

The project is still in the very early stages and at this point there is no commitment from the Department of Transport to continue or to build if the options don’t solve the current problems or offer value for money.

View our handy one page summary and next steps for the scheme.

If you have any specific questions or would like further information on the scheme, you can contact us as follows:

Email: MNWQ@highwaysengland.co.uk
Phone: 0300 470 2216

Timeline

Date Event
Spring/summer 2019 Completion of options identification and short-listing
Spring 2020 Decision to proceed
2020 Public consultation
TBC Preferred route announcement

Why we need this scheme

The M60 plays an important role in keeping traffic moving and is one of the busiest in England with 180,000 journeys a day. We recognise the importance of the north west section of the motorway, enabling the development of the economy in the region and the Government’s aspirations associated with the “Northern Powerhouse”.

The MNWQ project represents a transformational change for the Greater Manchester region, improving journey times, connectivity and supporting economic growth. It would also improve the overall experience for road users travelling longer distances.

Aims

The aim of this work is to further investigate the improvements to the transport network that can underpin the vision for transforming and re-balancing the national economy and establishing the North as a global powerhouse.

The Manchester North West Quadrant project aims to:

  • facilitate and support the delivery of the Northern Powerhouse by ensuring the Manchester North-West Quadrant enables transformational growth in the employment, housing and the economic output of the North
  • create a more reliable, less congested and better-connected transport network that works for the users who rely on it
  • maximise opportunities for improvement to the environment and seek opportunities to minimise adverse impacts particularly to air quality and noise

Project media files and documents

There are no images for this project
There are no videos for this project

Project timeline

Planned roadworks

Roadworks and Events for England

The latest incident information for England's motorway and trunk routes provided by Highways England

Location : The M60 anticlockwise between junctions J13 and J12 . Reason : Roadworks scheme. Status : Currently Active. Period : from 23:01 on 9 March 2020 to 06:00 on 1 April 2020.
Posted: March 28, 2020, 2:20 pm
Location : The M602 eastbound at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:58 am
Location : The M62 eastbound between junctions J10 and J11 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:57 am
Location : The M62 eastbound exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:53 am
Location : The M62 eastbound between junctions J11 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:53 am
Location : The M60 anticlockwise entry slip at junction J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:51 am
Location : The M602 westbound at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:48 am
Location : The M60 clockwise entry slip at junction J12 from M62 Eastbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:48 am
Location : The M602 eastbound entry slip at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:46 am
Location : The M60 clockwise exit slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:46 am
Location : The M60 clockwise between junctions J11 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : There will be one of three lanes closed.
Posted: March 28, 2020, 6:45 am
Location : The M60 anticlockwise exit slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:45 am
Location : The M60 anticlockwise between junctions J13 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : There will be one of four lanes closed.
Posted: March 28, 2020, 6:40 am
Location : The M62 westbound entry slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:40 am
Location : The M60 anticlockwise at junction J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : There will be one of two lanes closed.
Posted: March 28, 2020, 6:40 am
Location : The M62 westbound between junctions J12 and J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:38 am
Location : The M62 westbound exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:38 am
Location : The M62 westbound exit slip at junction J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 6:36 am
Location : The M602 eastbound at junction J1 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:15 am
Location : The M62 eastbound between junctions J10 and J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:13 am
Location : The M62 eastbound exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:12 am
Location : The M62 eastbound between junctions J11 and J12 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:12 am
Location : The M60 clockwise entry slip at junction J12 from M62 Eastbound. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:05 am
Location : The M60 anticlockwise entry slip at junction J12 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020.
Posted: March 28, 2020, 6:03 am
Location : The M60 anticlockwise exit slip at junction J13 . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 20:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 March 2020 to 9 April 2020. Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 April 2020 to 22 April 2020. Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 April 2020 to 22 May 2020. Lanes Closed : There will be one of two lanes closed.
Posted: March 28, 2020, 6:01 am
Location : The M66 southbound between junctions J1 and J2 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 4 April 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 April 2020 to 9 April 2020. Lanes Closed : There will be one of two lanes closed.
Posted: March 28, 2020, 5:48 am
Location : The M66 southbound between junctions J2 and J4 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 4 April 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 April 2020 to 9 April 2020. Lanes Closed : There will be one of three lanes closed.
Posted: March 28, 2020, 5:47 am
Location : The A627M southbound exit slip to the A627 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 28 March 2020 to 05:00 on 29 March 2020. Schedule : From 20:00 on 29 March 2020 to 05:00 on 30 March 2020. Schedule : From 20:00 on 31 March 2020 to 05:00 on 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 5:39 am
Location : The M60 clockwise between junctions J22 and J23 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 05:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 March 2020 to 1 April 2020. Lanes Closed : There will be two of four lanes closed.
Posted: March 28, 2020, 5:16 am
Location : The M60 clockwise at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 28 March 2020 to 05:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 March 2020 to 1 April 2020. Lanes Closed : There will be two of three lanes closed.
Posted: March 28, 2020, 5:14 am
Location : The M66 southbound between the A56 and junction J2 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 April 2020 to 4 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 5:13 am
Location : The M62 westbound entry slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 27 March 2020 to 06:00 on 28 March 2020. Schedule : From 21:00 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 5:08 am
Location : The M66 southbound entry slip at junction J3 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 27 March 2020 to 05:00 on 28 March 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 4 April 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 April 2020 to 9 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 28, 2020, 4:58 am
Location : The M62 westbound between junctions J12 and J10 . Reason : Roadworks scheme. Status : Currently Active. Period : from 23:01 on 9 March 2020 to 06:00 on 1 April 2020.
Posted: March 27, 2020, 7:52 pm
Location : The M66 northbound between junctions J2 and J1 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 27, 2020, 7:14 pm
Location : The M66 northbound between junctions J4 and J2 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 27, 2020, 6:04 pm
Location : The M66 northbound between junction J2 and the A56 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 27, 2020, 6:04 pm
Location : The M66 southbound between junctions J1 and J4 . Reason : Roadworks scheme. Status : Currently Active. Period : from 06:59 on 20 March 2020 to 05:00 on 9 April 2020.
Posted: March 27, 2020, 5:34 pm
Location : The M602 westbound between junctions J2 and J1 . Lane Closures : Lane three is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020. Lanes Closed : There is one of four lanes closed.
Posted: March 27, 2020, 5:21 pm
Location : The M62 westbound between junctions J22 and J20 . Reason : Horticultural works are planned. Status : Pending. Schedule : Expect disruption everyday between 07:30 and 16:30 from 30 March 2020 to 3 April 2020. Schedule : Expect disruption everyday between 07:30 and 16:30 from 6 April 2020 to 8 April 2020. Schedule : Expect disruption everyday between 07:30 and 16:30 from 14 April 2020 to 17 April 2020. Schedule : Expect disruption everyday between 07:30 and 16:30 from 20 April 2020 to 24 April 2020.
Posted: March 27, 2020, 4:32 pm
Location : The M66 southbound between junctions J2 and J3 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 27, 2020, 10:21 am
Location : The M60 clockwise between junctions J22 and J23 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:00 on 26 March 2020 to 05:00 on 1 April 2020.
Posted: March 26, 2020, 9:01 pm
Location : The M66 southbound between junctions J1 and J2 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 26, 2020, 9:42 am
Location : The M602 eastbound between junctions J2 and J3 . Reason : Roadworks scheme. Status : Currently Active. Period : from 05:02 on 24 February 2020 to 05:00 on 9 April 2020.
Posted: March 26, 2020, 9:40 am
Location : The M66 northbound exit slip at junction J1 . Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 2 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 26, 2020, 5:13 am
Location : The M66 northbound at junction J2 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 2 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 26, 2020, 5:10 am
Location : The M66 northbound between junction J2 and the A56 . Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 2 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 26, 2020, 5:08 am
Location : The M62 eastbound between junctions J19 and J20 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 30 March 2020 to 06:00 on 1 April 2020.
Posted: March 25, 2020, 5:27 pm
Location : The A627M southbound between the junctions with the A664 and the M62 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2020 to 1 April 2020. Lanes Closed : There will be one of two lanes closed.
Posted: March 25, 2020, 5:23 pm
Location : The M62 eastbound at junction J20 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2020 to 1 April 2020. Lanes Closed : There will be one of three lanes closed.
Posted: March 25, 2020, 5:23 pm
Location : The A627M northbound between the junctions with the A664 and the M62 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2020 to 1 April 2020. Lanes Closed : There will be two of three lanes closed.
Posted: March 25, 2020, 5:23 pm
Location : The M62 eastbound exit slip at junction J20 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2020 to 1 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 25, 2020, 5:23 pm
Location : The M62 eastbound between junctions J19 and J20 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2020 to 1 April 2020. Lanes Closed : There will be one of four lanes closed.
Posted: March 25, 2020, 5:23 pm
Location : The M66 northbound between junctions J3 and J2 . Lane Closures : Lane two will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 March 2020 to 2 April 2020. Lanes Closed : There will be one of three lanes closed.
Posted: March 25, 2020, 5:23 pm
Location : The M61 southbound between junctions J2 and J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 4 April 2020. Lanes Closed : There will be two of four lanes closed.
Posted: March 25, 2020, 2:07 pm
Location : The M60 clockwise between junctions J13 and J15 . Lane Closures : Lanes 2, 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 March 2020 to 4 April 2020. Lanes Closed : There will be three of four lanes closed.
Posted: March 25, 2020, 2:07 pm
Location : The M66 northbound at junction J4 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:30 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : From 21:30 on 29 March 2020 to 06:00 on 30 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 25, 2020, 1:49 pm
Location : The M66 northbound between junctions J4 from M62 and J3 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:30 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : From 21:30 on 29 March 2020 to 06:00 on 30 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 25, 2020, 1:49 pm
Location : The M60 slip road to the M66 northbound . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:30 on 28 March 2020 to 06:00 on 29 March 2020. Schedule : From 21:30 on 29 March 2020 to 06:00 on 30 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 25, 2020, 1:49 pm
Location : The A627M southbound between the M62 and the junction with the A663 . Reason : Roadworks are planned. Status : Pending. Schedule : From 08:30 on 1 April 2020 to 17:00 on 15 May 2020.
Posted: March 25, 2020, 12:35 pm
Location : The A627M northbound between the junctions with the M62 and the A664 . Reason : Roadworks are planned. Status : Pending. Schedule : From 08:30 on 1 April 2020 to 17:00 on 15 May 2020.
Posted: March 25, 2020, 12:35 pm
Location : The A627M northbound between the A663 and the junction with the A664 . Reason : Roadworks are planned. Status : Pending. Schedule : From 08:30 on 1 April 2020 to 17:00 on 15 May 2020.
Posted: March 25, 2020, 12:35 pm
Location : The A627M northbound between the junctions with the A664 and the M62 . Reason : Roadworks are planned. Status : Pending. Schedule : From 08:30 on 1 April 2020 to 17:00 on 15 May 2020.
Posted: March 25, 2020, 12:35 pm
Location : The M62 westbound between junctions J22 and J20 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 20:00 on 3 April 2020 to 06:00 on 4 April 2020. Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 April 2020 to 8 April 2020. Lanes Closed : There will be two of three lanes closed.
Posted: March 25, 2020, 11:54 am
Location : The M66 southbound between junctions J3 and J4 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 25, 2020, 8:08 am
Location : The M66 southbound entry slip at junction J3 . Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:30 on 29 March 2020 to 05:00 on 30 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 24, 2020, 11:00 am
Location : The M602 westbound at junction J1 . Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020.
Posted: March 24, 2020, 11:00 am
Location : The M66 southbound between junctions J3 and J4 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M66 southbound between the A56 and junction J1 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M60 clockwise between junctions J17 and J18 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 05:00 on 31 March 2020.
Posted: March 24, 2020, 11:00 am
Location : The M62 eastbound between junctions J9 and J12 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:00 on 16 March 2020 to 06:00 on 1 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M60 clockwise entry slip at junction J14 . Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 December 2020. Lanes Closed : There is one of two lanes closed.
Posted: March 24, 2020, 11:00 am
Location : The M66 northbound between junctions J2 and J1 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 14 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M602 westbound at junction J2 . Reason : Roadworks scheme. Status : Currently Active. Period : from 05:01 on 23 February 2020 to 05:00 on 9 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M62 westbound between junctions J19 and J18 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:03 on 2 March 2020 to 05:00 on 31 March 2020.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise entry slip at junction J20 . Reason : Road repairs are planned. Status : Pending. Schedule : From 21:00 on 30 March 2020 to 05:00 on 31 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise between junctions J5 and J4 . Lane Closures : The hard shoulder is closed. Reason : Barrier repairs. Status : Currently Active. Period : expect disruption until 23:59 on 31 December 2020.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise exit slip at junction J22 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:00 on 1 April 2020 to 05:00 on 2 April 2020. Lanes Closed : All lanes will be closed.
Posted: March 24, 2020, 11:00 am
Location : The M60 clockwise between junctions J11 and J12 . Reason : Roadworks scheme. Status : Currently Active. Period : from 23:03 on 9 March 2020 to 06:00 on 1 April 2020.
Posted: March 24, 2020, 11:00 am
Location : The M602 westbound between junctions J2 and J1 . Reason : Roadworks scheme. Status : Currently Active. Period : from 22:01 on 13 December 2018 to 06:00 on 31 March 2020.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise entry slip at junction J17 . Lane Closures : The hard shoulder is closed. Reason : Roadside Equipment Maintenance. Status : Currently Active. Period : expect disruption until 05:00 on 31 March 2020.
Posted: March 24, 2020, 11:00 am
Location : The M602 eastbound between junctions J2 and J3 . Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 05:00 on 9 April 2020. Lanes Closed : There is one of three lanes closed.
Posted: March 24, 2020, 11:00 am
Location : The M62 westbound between junctions J12 and J11 . Lane Closures : Lane three is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020. Lanes Closed : There is one of four lanes closed.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise exit slip at junction J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:00 on 30 March 2020 to 05:00 on 31 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 24, 2020, 11:00 am
Location : The M602 westbound at junction J2 . Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 05:00 on 9 April 2020. Lanes Closed : There is one of four lanes closed.
Posted: March 24, 2020, 11:00 am
Location : The M60 anticlockwise entry slip at junction J21 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 21:00 on 30 March 2020 to 05:00 on 31 March 2020. Lanes Closed : All lanes will be closed.
Posted: March 24, 2020, 11:00 am
Location : The M602 eastbound entry slip at junction J2 . Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 05:00 on 9 April 2020. Lanes Closed : There is one of two lanes closed.
Posted: March 24, 2020, 11:00 am

Announcements

Breaking News: Traffic Information

Breaking News

The latest current breaking news items for England's motorway network

Regional Twitter feed

Keep up-to-date

Sign up for updates
Please leave feedback