M56 junction 6 to 8 smart motorway

Improving the M56 motorway between junction 6 (Manchester Airport) and junction 8 (Bowdon) by making it a smart motorway.

Region:  North West
Start date:  2019-20
Cost:  TBC
Status:  PLANNED
Type:  Major Scheme
End date:  2021-22
Programme:  North-west smart motorways

Have your say

We've introduced a new engagement tool where you can give us your views. Please click on the map below to add your comments about specific parts of the project.

Preview image of interactive map for m56 J6 to 8 smart motorway

Progress report

We’re holding two public information events in January 2020 on our plans to convert the M56 into a smart motorway between junctions 6 and 8.

We’d like to talk to you about the project before we start the construction work, and answer any questions you may have.

The events will be held on:

  • Friday 17 January 2020 between 2pm and 5pm at the Manchester Airport Marriott Hotel, Hale Road, Hale Barns, WA15 8XW
  • Saturday 18 January 2020 between 10am and 3pm at St Peter’s Assembly Rooms, 134 Cecil Road, Hale, Altrincham, WA15 9NU

Free parking is available at both events. Please note if you plan on staying longer than three hours at the Manchester Airport Marriott Hotel on 17 January, you'll need to supply your vehicle registration number at the hotel reception.

If you're unable to attend these events but would like to speak to somebody about the project, you can contact us on the details below.

Email: M56J6-8SmartMotorway@highwaysengland.co.uk
Telephone: 0300 123 5000 (Customer Contact Centre)
Write to: M56 J6-8 project team, Highways England, 2 Colmore Square, Birmingham, B4 6BN

What's next?

Advance vegetation clearance January to March 2020

We’re progressing our plans to upgrade the M56 between junctions 6 and 8 to a smart motorway. Advance vegetation clearance work is integral to preparing the motorway for the construction phase of the scheme. The vegetation removal work will be carried out between 9pm and 5am from January 2020 to March 2020.

It is essential that we carry out this work at night to avoid major disruption to motorists and to ensure safety, the hard shoulder will be closed permanently on each side of the carriageway, with occasional lane closures on both sides between 9pm and 5am.

In order to minimise any disturbance to the local community, we'll use equipment that emits low levels of noise and will phase our works when in close proximity to residential properties. We'd like to thank you in advance for your patience and apologise for any disturbance that our work may cause throughout the course of the scheme.

Timeline

Event Date
2 September 2019 – 30 September 2019 Statutory Instrument Consultation
Spring 2020 Construction begins
Spring 2022 Road open for traffic

Why we need this scheme

This four-mile stretch of road, which is linked to several arterial trunk roads, is a vital part of the network for commuters travelling into Manchester city centre. This section of the M56 carries in excess of 100,000 vehicles per day.

This scheme is part of our programme to add capacity to the existing strategic road network in order to support economic growth and maintain mobility.

Aims

It is expected that this smart motorway scheme will:

  • increase motorway capacity and reduce congestion on this key route into Manchester
  • smooth traffic flows
  • provide more reliable journey times to Manchester Airport
  • increase and improve the quality of information for the driver, for example, through variable messaging signs (in relation to the operation of the motorway)

Scheme in detail

Smart motorways are a technology-driven approach to tackling the most congested parts of the motorway network, improving journey reliability by controlling the flow and speed of traffic. Smart motorways also support the economy by providing much-needed capacity on the busiest motorways, while maintaining safety for road users and those who work on the roads.

The existing M56 is a rural dual three-lane motorway with a hard shoulder, with the exception of sections on both carriageways near junction 7 where the hard shoulder has been converted into additional running lanes. This new scheme includes the conversion of the hard shoulder between junction 6 and 7 and westbound through junction 6 into a running lane.

The scheme involves:

  • converting the hard shoulder to create a new additional permanent traffic lane between junctions 6 and 8, increasing capacity to reduce congestion.
  • new electronic information signs and signals and CCTV cameras on overhead gantries. These will show variable mandatory speed limits and manage traffic flow and incidents.
  • installing remotely operated temporary traffic management signs along the entire route, which form a key safety feature of the works.
  • four new emergency areas to provide an area of relative safety following a breakdown.
  • new emergency roadside telephones in each emergency area. These will connect you directly to our Regional Control Centres and pinpoint your location.
  • replacing the central reservation with a new rigid concrete barrier between junctions 6 and 8 to help increase safety.
  • the provision of new low-noise surfacing on lanes 1 and 4 on both sides of the carriageway.

Contact us

There are several ways you can contact us to discuss the scheme.

Phone: 0300 123 5000

Email: M56J6-8SmartMotorway@highwaysengland.co.uk

Mailing address: M56 J6-8, Highways England, 2 Colmore Square, Birmingham, B4 6BN.

Environmental impact

Potential environmental impacts and measures to minimise them are investigated as part of this scheme.

The key issues considered include:

  • understanding the presence of protected species
  • understanding potential changes to air quality
  • minimising the loss of existing visual screening provided by vegetation
  • understanding potential changes to noise and vibration
  • identifying measures to minimise disturbance to human and ecological receptors

An environmental screening exercise indicates that it is unlikely there will be any significant negative effects resulting from this scheme.

However, as part of our works, we will:

  • introduce a new low noise surface on lanes 1 and 4
  • deliver the scheme through an ongoing approach to environmental management through a dedicated Outline Environmental Management Plan

To view a copy of the Environmental Impact Assessment screening, Environmental Assessment Report or Outline Environment Management Plan, please search the ‘Media and Documents’ section of this web page.

Project media files and documents

There are no images for this project
There are no videos for this project

Project timeline

Planned roadworks

Roadworks and Events for England

The latest incident information for England's motorway and trunk routes provided by Highways England

Location : The M56 westbound between junctions J10 and J11 . Lane Closures : Lane three is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 05:00 on 19 January 2020. Lanes Closed : There is one of three lanes closed.
Posted: January 18, 2020, 9:01 pm
Location : The M56 eastbound between junctions J11 and J10 . Lane Closures : Lane three is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 05:00 on 19 January 2020. Lanes Closed : There is one of three lanes closed.
Posted: January 18, 2020, 9:01 pm
Location : The M60 anticlockwise between junctions J13 and J12 . Reason : Roadworks scheme. Status : Currently Active. Period : from 23:00 on 17 January 2020 to 06:00 on 31 March 2020.
Posted: January 18, 2020, 5:33 pm
Location : The M62 westbound between junctions J12 and J11 . Lane Closures : Lane one is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 1 April 2020. Lanes Closed : There is one of three lanes closed.
Posted: January 18, 2020, 4:30 pm
Location : The M62 westbound between junctions J12 and J10 . Reason : Roadworks scheme. Status : Currently Active. Period : from 23:00 on 17 January 2020 to 06:00 on 31 March 2020.
Posted: January 18, 2020, 2:03 pm
Location : The M60 anticlockwise exit slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M60 clockwise between junctions J11 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 18, 2020, 6:06 am
Location : The M60 anticlockwise at junction J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 18, 2020, 6:06 am
Location : The M62 westbound between junctions J12 and J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M62 westbound exit slip at junction J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M62 westbound exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M60 anticlockwise between junctions J13 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 18, 2020, 6:06 am
Location : The M62 westbound entry slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M6 northbound entry slip at junction J21A from M62 westbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M62 westbound entry slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M602 westbound at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M6 southbound entry slip at junction J21A from M62 Westbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 23:00 and 06:00 from 23 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 23:00 and 06:00 from 27 January 2020 to 30 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 January 2020 to 5 February 2020. Schedule : From 21:00 on 8 February 2020 to 06:00 on 9 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:06 am
Location : The M6 southbound between junctions J19 and J18 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:30 and 06:00 from 20 January 2020 to 23 January 2020. Schedule : From 20:30 on 24 January 2020 to 06:00 on 25 January 2020. Schedule : Expect disruption everyday between 20:30 and 06:00 from 27 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 20:30 and 06:00 from 3 February 2020 to 8 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 18, 2020, 6:03 am
Location : The M6 southbound entry slip at junction J21A from M62 Westbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 January 2020 to 29 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:01 am
Location : The M6 northbound entry slip at junction J21A from M62 westbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 January 2020 to 29 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 6:01 am
Location : The M56 eastbound exit slip at junction J5 for Manchester Airport. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 05:00 on 21 January 2020. Schedule : From 21:00 on 31 January 2020 to 05:00 on 1 February 2020. Schedule : From 21:00 on 24 February 2020 to 05:00 on 25 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 5:02 am
Location : The M56 eastbound exit slip at junction J9 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2020 to 8 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 18, 2020, 5:01 am
Location : The M62 westbound exit slip at junction J10 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 17 January 2020 to 06:00 on 18 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 25 January 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 January 2020 to 29 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 4:09 am
Location : The M6 southbound entry slip at junction J20A from M56 east. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 17 January 2020 to 05:00 on 18 January 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2020 to 8 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 18, 2020, 1:46 am
Location : The M56 westbound between junctions J6 and J9 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:02 on 17 January 2020 to 05:00 on 29 February 2020.
Posted: January 17, 2020, 9:02 pm
Location : The M56 westbound between junctions J6 and J9 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:00 on 17 January 2020 to 05:00 on 8 March 2020.
Posted: January 17, 2020, 9:01 pm
Location : The M6 southbound entry slip at junction J20A from M56 east. Reason : Roadworks scheme. Status : Currently Active. Period : from 20:52 on 17 January 2020 to 05:00 on 8 February 2020.
Posted: January 17, 2020, 8:52 pm
Location : The M60 anticlockwise between junctions J1 and J25 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 31 January 2020.
Posted: January 17, 2020, 6:21 pm
Location : The M6 southbound between junctions J21 and J20 . Lane Closures : The hard shoulder is closed. Reason : Emergency barrier repairs. Status : Currently Active. Period : expect disruption until 12:01 on 16 December 2020.
Posted: January 17, 2020, 5:18 pm
Location : The M602 westbound between junctions J2 and J1 . Lane Closures : Lane three is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020. Lanes Closed : There is one of four lanes closed.
Posted: January 17, 2020, 5:04 pm
Location : The M60 anticlockwise at junction J4 . Lane Closures : Lane two will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:30 on 20 January 2020 to 05:00 on 21 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise exit slip at junction J4 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 05:00 on 21 January 2020. Schedule : From 21:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : From 21:00 on 25 February 2020 to 05:00 on 26 February 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J12 From M602 Westbound and J10 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J3 and J1 . Lane Closures : Lane two will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:30 on 20 January 2020 to 05:00 on 21 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J5 and J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Schedule : From 21:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 February 2020 to 7 February 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 westbound between junctions J2 and J1 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J20A and J19 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J7 and J9 . Lane Closures : Lane three will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 00:45 on 22 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound at junction J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 January 2020 to 22 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 3 February 2020 to 5 February 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J7 and J6 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2020 to 29 January 2020. Schedule : From 20:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 February 2020 to 8 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J7 and J6 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 January 2020 to 22 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 3 February 2020 to 5 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound exit slip at junction J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 05:00 on 23 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound exit slip at junction J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Schedule : From 21:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 February 2020 to 7 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J11 and J10 . Lane Closures : Lane one will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 22 January 2020 to 24 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise at junction J11 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J9 and J7 . Lane Closures : Lane three will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J6 and J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2020 to 29 January 2020. Schedule : From 20:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 February 2020 to 8 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound entry slip at junction J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 January 2020 to 23 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2020 to 29 January 2020. Schedule : From 20:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 3 February 2020 to 8 February 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound at junction J5 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 January 2020 to 25 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J21 and J20 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be three of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J13 and J11 . Lane Closures : Lanes 1, 2, 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound entry slip at junction J20 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise exit slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 22 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 northbound between junctions J21 and J21A . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 December 2021.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J13 and J12 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 northbound at junction J21A . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise exit slip at junction J11 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J22 and J21A . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J5 and J4 . Lane Closures : Lane two will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:30 on 20 January 2020 to 05:00 on 21 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J22 and J21A . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 06:00 on 1 April 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise entry slip at junction J27 . Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 05:00 on 23 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 northbound entry slip at junction J20 from the M56 west. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 January 2020 to 07:00 on 26 January 2020. Schedule : From 21:00 on 26 January 2020 to 06:00 on 27 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound entry slip at junction J5 from Manchester Airport. Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 February 2020 to 7 February 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2020 to 12 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J5 and J4 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 23 January 2020 to 06:00 on 24 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J7 and J9 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 January 2020 to 07:00 on 26 January 2020. Schedule : From 21:00 on 26 January 2020 to 06:00 on 27 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J21A and J21 . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 December 2021.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J27 and J21 . Reason : Roadworks scheme. Status : Currently Active. Period : from 14:52 on 21 January 2019 to 06:00 on 31 December 2021.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J21 and J19 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J4 and J5 . Lane Closures : Lanes 1, 2, 3 and 4 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 05:00 on 21 January 2020. Schedule : From 21:00 on 25 February 2020 to 05:00 on 26 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 northbound between junctions J18 and J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadside equipment maintenance is planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J6 and J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 January 2020 to 25 January 2020. Schedule : From 20:00 on 29 January 2020 to 05:00 on 30 January 2020. Schedule : From 20:00 on 31 January 2020 to 05:00 on 1 February 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 February 2020 to 15 February 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound exit slip at junction J21A to M62 East. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound at junction J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 23 January 2020 to 06:00 on 24 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound exit slip at junction J21A to M62 East. Lane Closures : Lane one is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020. Lanes Closed : There is one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise entry slip at junction J12 From M602 Westbound. Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J7 and J5 for Manchester Airport. Reason : Roadworks scheme. Status : Currently Active. Period : from 21:01 on 16 January 2020 to 05:00 on 9 March 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J13 and J12 . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 22 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J3 and J1 for A34. Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : From 05:00 on 23 January 2020 to 20:00 on 24 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound at junction J6 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2020 to 29 January 2020. Schedule : From 20:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 February 2020 to 8 February 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound exit slip at junction J21A to M62 West. Lane Closures : Lane two is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 23:59 on 31 March 2020. Lanes Closed : There is one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J2 and J25 . Lane Closures : Lane two will be closed. Reason : Horticultural works are planned. Status : Pending. Schedule : From 20:30 on 20 January 2020 to 05:00 on 21 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J27 and J21A . Lane Closures : The hard shoulder is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 December 2021.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise entry slip at junction J5 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:30 on 20 January 2020 to 05:30 on 21 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound entry slip at junction J5 from Manchester Airport. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 January 2020 to 25 January 2020. Schedule : From 21:00 on 29 January 2020 to 05:00 on 30 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J11 and J10 . Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise exit slip at junction J10 . Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise between junctions J5 and J4 . Lane Closures : Lane one will be closed. Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 22 January 2020 to 24 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise at junction J13 . Lane Closures : Lane one will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 22 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise at junction J4 . Reason : Barrier repairs are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 20:00 on 24 January 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise entry slip at junction J12 from M62 Eastbound. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J6 and J5 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 05:00 on 21 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound exit slip at junction J2 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 04:30 on 23 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise between junctions J26 and J1 . Lane Closures : The hard shoulder is closed. Reason : Litter Clearance. Status : Currently Active. Period : expect disruption until 17:00 on 31 January 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M602 westbound between junctions J2 and J1 . Reason : Roadworks scheme. Status : Currently Active. Period : from 22:01 on 13 December 2018 to 06:00 on 31 March 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound at junction J6 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Schedule : From 21:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 21:00 and 05:00 from 5 February 2020 to 7 February 2020. Lanes Closed : There will be two of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound at junction J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 22 January 2020 to 05:00 on 23 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2020 to 29 January 2020. Schedule : From 20:00 on 30 January 2020 to 05:00 on 31 January 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 5 February 2020 to 8 February 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M60 clockwise entry slip at junction J2 . Lane Closures : Lane one will be closed. Reason : Litter clearance is planned. Status : Pending. Schedule : From 20:30 on 22 January 2020 to 05:00 on 23 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound between junctions J7 and J5 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 20 January 2020 to 05:00 on 22 February 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M60 anticlockwise entry slip at junction J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J10 and J11 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound at junction J2 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 04:30 on 23 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound between junctions J5 from Manchester Airport and J6 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 05:00 on 23 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound between junctions J1 and J2 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 04:30 on 23 January 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 eastbound exit slip at junction J9 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 westbound at junction J1 . Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound exit slip at junction J9 to A50. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 25 January 2020 to 07:00 on 26 January 2020. Schedule : From 21:00 on 26 January 2020 to 06:00 on 27 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound entry slip at junction J2 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 23 January 2020 to 04:30 on 24 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound at junction J7 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 January 2020 to 25 January 2020. Schedule : From 20:00 on 29 January 2020 to 05:00 on 30 January 2020. Schedule : From 20:00 on 31 January 2020 to 05:00 on 1 February 2020. Schedule : Expect disruption everyday between 20:00 and 05:00 from 12 February 2020 to 15 February 2020. Lanes Closed : There will be one of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J19 and J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 00:45 on 23 January 2020 to 05:00 on 23 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound exit slip at junction J5 for Manchester Airport. Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 05:00 on 21 January 2020. Schedule : From 21:00 on 25 February 2020 to 05:00 on 26 February 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M602 eastbound at junction J1 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound at junction J5 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 22 January 2020 to 05:00 on 23 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound exit slip at junction J11 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J11 and J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 westbound between junctions J12 and J11 . Lane Closures : Lane three is closed. Reason : Roadworks. Status : Currently Active. Period : expect disruption until 06:00 on 31 March 2020. Lanes Closed : There is one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J11 and J12 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 1 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2020 to 18 February 2020. Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 February 2020 to 23 February 2020. Schedule : From 21:00 on 29 February 2020 to 06:00 on 1 March 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 westbound entry slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2020 to 22 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The A5103 northbound between the junctions with the M56 and the M60 . Lane Closures : Lane one will be closed. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:30 on 20 January 2020 to 05:30 on 21 January 2020. Lanes Closed : There will be one of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound entry slip at junction J20A from M56 east. Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be one of two lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M56 westbound entry slip at junction J9 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2020 to 25 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 westbound entry slip at junction J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 00:45 on 22 January 2020 to 06:00 on 22 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound at junction J19 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be two of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J19 and J18 . Reason : Roadworks scheme. Status : Currently Active. Period : from 21:14 on 6 January 2020 to 06:00 on 15 February 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J19 and J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 21 January 2020 to 05:00 on 22 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J11 and J12 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020. Lanes Closed : There will be two of three lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J19 and J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 21:00 on 23 January 2020 to 05:00 on 24 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J9 and J12 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 21:00 on 20 January 2020 to 06:00 on 1 April 2020.
Posted: January 17, 2020, 2:36 pm
Location : The M6 southbound between junctions J19 and J18 . Lane Closures : Lanes 1 and 2 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : From 20:00 on 23 January 2020 to 06:00 on 24 January 2020. Lanes Closed : There will be two of four lanes closed.
Posted: January 17, 2020, 2:36 pm
Location : The M62 eastbound between junctions J11 and J12 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 23:00 on 19 January 2020 to 05:00 on 20 January 2020.
Posted: January 17, 2020, 2:36 pm
Location : The A5103 northbound. Reason : Barrier repairs are planned. Status : Pending. Schedule : From 21:30 on 20 January 2020 to 05:30 on 21 January 2020. Lanes Closed : All lanes will be closed.
Posted: January 17, 2020, 2:36 pm

Announcements

Breaking News: Traffic Information

Breaking News

The latest current breaking news items for England's motorway network

Regional Twitter feed

Keep up-to-date

Sign up for updates
Please leave feedback