M25 junction 10 to junction 16 smart motorway

We're improving the M25 between junction 10 and junction 16.

Region:  South East
Start date:  2020/21
Cost:  £200million - £400million
Status:  PLANNED
Type:  Major Scheme
End date:  2023
Programme:  Smart motorways

Progress report

We're currently working up smart motorway design options that will meet the aims of this scheme.

The government announced that the preferred solution was for a smart motorway with all-lane running at junctions 15 to 16 and also at junctions 10, 11 and 12. This means the existing hard shoulder would be converted into a traffic lane providing five lanes for traffic at junctions 15 to 16 and four lanes elsewhere. Emergency Areas are available in place of the hard shoulder for emergency use.

As part of this we'll assess a wide range of information about the road to establish the nature of the current problems. We have developed an outline design concept which has determined the most appropriate smart motorway operating regime for this section of road. We are currently working on the preliminary design details including the environmental assessment for the scheme. This is to support the concept design with a view of completing this stage by summer 2019.

We are liaising with local authorities and technical stakeholders so that we can take into account their views.

What's next?

Detailed design to enable construction to start in 2020.

Timeline

Government announces scheme December 2014
Works start 2020
Works complete 2023

Why we need this scheme

The M25 junctions 10 to 16 has the highest traffic flows on the strategic road network, with junctions 15 to 16 a particular problem area being situated between two major motorways (the M40 and M4). Junctions 10 to 16 runs through areas of the Metropolitan Green Belt and several urban and suburban settlements. Junction 14 connects the M25 directly to London Heathrow Airport.

The two-way vehicle flows on the section exceed 200,000 vehicles per day, which results in frequent congestion and severe delay to road users.

A separate scheme is proposed for the interchange at junction 10.

A separate strategic study is looking at longer term options to improve the performance of the transport network between junctions 10 and 16 of the M25.

Aims

This scheme aims to:

  • reduce congestion and delays
  • improve journey time reliability
  • maintain a high standard of safety
  • support economic growth and job creation

Project media files and documents

There are no images for this project
There are no videos for this project

Project timeline

Planned roadworks

Roadworks and Events for England

The latest incident information for England's motorway and trunk routes provided by Highways England

Location : The M25 clockwise between junctions J10 and J11 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : There will be three of four lanes closed.
Posted: December 14, 2019, 6:04 am
Location : The M25 clockwise between junctions J9 and J10 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : There will be three of four lanes closed.
Posted: December 14, 2019, 6:04 am
Location : The M25 clockwise at junction J10 . Lane Closures : Lanes 1, 2 and 3 will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 14, 2019, 6:04 am
Location : The M25 clockwise exit slip at junction J10 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 14, 2019, 6:02 am
Location : The A3 southbound at the junction with the M25 . Lane Closures : Lane two will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 22:30 on 15 December 2019 to 05:30 on 16 December 2019. Lanes Closed : There will be one of two lanes closed.
Posted: December 13, 2019, 12:21 pm
Location : The A3 southbound between the M25 and the junction with the A247 . Reason : Road repairs are planned. Status : Pending. Schedule : From 22:30 on 15 December 2019 to 05:30 on 16 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 13, 2019, 12:21 pm
Location : The A3 southbound entry slip from the M25 . Reason : Road repairs are planned. Status : Pending. Schedule : From 22:30 on 15 December 2019 to 05:30 on 16 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 13, 2019, 12:21 pm
Location : The A3 southbound between the A245 and the junction with the M25 . Lane Closures : Lanes 2 and 3 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : From 22:30 on 15 December 2019 to 05:30 on 16 December 2019. Lanes Closed : There will be two of three lanes closed.
Posted: December 13, 2019, 12:21 pm
Location : The M25 anticlockwise between junctions J10 and J9 . Lane Closures : Lanes 2, 3 and 4 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 18 December 2019. Lanes Closed : There will be three of four lanes closed.
Posted: December 12, 2019, 8:10 pm
Location : The M25 anticlockwise exit slip at junction J9 . Reason : Emergency barrier repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 18 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 12, 2019, 8:10 pm
Location : The M25 clockwise entry slip at junction J10 . Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : All lanes will be closed.
Posted: December 12, 2019, 8:10 pm
Location : The M25 anticlockwise between junctions J9 and J8 . Lane Closures : Lanes 2, 3 and 4 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 18 December 2019. Lanes Closed : There will be three of four lanes closed.
Posted: December 12, 2019, 8:10 pm
Location : The M25 anticlockwise between junctions J9 and J8 . Lane Closures : Lanes 2, 3 and 4 will be closed. Reason : Road repairs are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 December 2019 to 20 December 2019. Lanes Closed : There will be three of four lanes closed.
Posted: December 12, 2019, 8:10 pm
Location : The M25 anticlockwise exit slip at junction J10 . Lane Closures : Lane one will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 22:00 and 05:30 from 16 December 2019 to 20 December 2019. Lanes Closed : There will be one of two lanes closed.
Posted: December 12, 2019, 8:10 pm

Announcements

Breaking News: Traffic Information

Breaking News

The latest current breaking news items for England's motorway network

The M11 in Cambridgeshire is closed northbound between J12 and J14
Posted: January 1, 1970, 12:00 am

Regional Twitter feed

Keep up-to-date

Sign up for updates
Please leave feedback