A64 Hopgrove

Improvements to the A64 Hopgrove junction.

Region:  North East
Start date:  TBC
Cost:  TBC
Status:  PLANNED
Type:  Major Scheme
End date:  TBC
Programme:  A64 maintenance improvements

Progress report

We've completed a feasibility study to establish the case for the junction improvement. The study also sought to confirm the problems and issues within the area of the junction and to consider the options which could address them.

For more information, please view the Feasibility Study Summary.

What's next?

We're continuing our investigations and working on options.

Why we need the scheme

The A64 Hopgrove junction consists of a large roundabout with traffic signals. The approach from the south/west is dual carriageway. The route north/east of the roundabout comprises a short length of dual carriageway which then merges into single carriageway. It also connects with the A1237 York outer ring road.

This results in queues and congestion which cause delays and accidents. This scheme proposes to reduce these by improving road standards.

This scheme was identified in the Road Investment Strategy.

Aims

The aims of this scheme are to:

  • improve road standards
  • reduce accident and casualty rates
  • reduce conflict with local traffic
  • reduce delays and congestion
  • improve journey time reliability
  • support planned developments

Project media files and documents

There are no images for this project
There are no videos for this project

Project timeline

Planned roadworks

Roadworks and Events for England

The latest incident information for England's motorway and trunk routes provided by Highways England

Announcements

Breaking News: Traffic Information

Breaking News

The latest current breaking news items for England's motorway network

The A49 is closed in both directions between the A4137 and the A40 due to a collision
Posted: January 1, 1970, 12:00 am

Regional Twitter feed

Keep up-to-date

Sign up for updates
Please leave feedback