A47 North Tuddenham to Easton improvement schemeRecently updated

The proposed scheme proposes a new dual carriageway to the south and north of the existing road. We are also proposing two new junctions.

Region:  East
Start date:  2021
Cost:  £100 million - £250 million
Status:  PLANNED
Type:  Major Scheme
End date:  2022
Programme:  A47 corridor improvement programme

Progress report

Plans for the A47 North Tuddenham to Easton dualling scheme are progressing following the Preferred Route Announcement after consultation with the public in August 2017.

An amended version of Option 2, with the route amended to address some of the key concerns raised, was chosen for the new dual carriageway between North Tuddenham and Easton.

You can contact us directly with your thoughts and suggestions by calling our Contact Centre on 0300 123 5000 or by emailing A47NorthTuddenhamtoEastonRIS@highwaysengland.co.uk

What's next?

We are continuing work to develop the design for the scheme. You will be able to give you feedback on our proposals during a full statutory consultation. The statutory consultation is scheduled for 2019.

Timeline

Date Event
2019 Statutory consultation
2020 Submission of Development Consent Order. You will have further opportunity to comment on the scheme at this stage
April 2021 Start of works
May 2023 Open for traffic

Why we need this scheme

The North Tuddenham to Easton section of the A47 connects key economic growth areas of Norwich.

The road between North Tuddenham and Easton is not adequate to cope with the high volume of traffic. There is a clear and demonstrable need to increase capacity along the to address current levels of congestion and the associated impacts on road and business users in the area. The safety of adjoining routes also increases the need for improvements to be made. There are limited opportunities to overtake slower moving vehicles whilst traveling on this single carriageway. This results in increased and unreliable journey times.

Future economic growth in the area may be hindered due to the capacity limitations of the current carriageway. Investment to increase capacity will facilitate local aspirations for increased land use and development and will contribute to local economic growth.

Aims

The aims and objectives of the proposed North Tuddenham to Easton dualling scheme are to:

  • contribute to sustainable economic growth by supporting employment and residential development opportunities
  • reduce congestion-related delay, improve journey time reliability and increase the overall capacity of the A47
  • improve road safety for all road users by being designed to modern highway standards appropriate for a major A road
  • increase the resilience of the road in coping with incidents such as collisions, breakdowns, maintenance and extreme weather
  • enable more reliable journey times and provide capacity for future traffic growth

The scheme in detail

The proposed scheme proposes a new dual carriageway to the south and north of the existing road. We are also proposing two new junctions. The first junction will be a roundabout at Berry’s Lane and Wood Lane and the second junction will be a roundabout located at Blind Lane and Taverham Road. Because of these additions to the side roads the Easton roundabout will be removed. These improvements will better connect side roads into the new dual carriageway.

Project media files and documents

There are no images for this project
There are no videos for this project

Project timeline

Planned roadworks

Roadworks and Events for England

The latest incident information for England's motorway and trunk routes provided by Highways England

Location : The A11 northbound between the A1075 and the junction with the A47 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 May 2018 to 2 June 2018. Schedule : Expect disruption everyday between 20:00 and 05:00 from 4 June 2018 to 9 June 2018. Lanes Closed : There will be one of two lanes closed.
Posted: May 25, 2018, 12:30 pm
Location : The A11 southbound between the A47 and the junction with the A1065 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 29 May 2018 to 05:00 on 9 June 2018.
Posted: May 25, 2018, 12:30 pm
Location : The A11 southbound between the junctions with the A47 and the A1075 . Reason : Roadworks scheme. Status : Currently Active. Period : from 20:04 on 23 May 2018 to 06:00 on 30 June 2018.
Posted: May 25, 2018, 12:30 pm
Location : The A11 southbound between the A47 and the junction with the A1075 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 May 2018 to 2 June 2018. Schedule : Expect disruption everyday between 20:00 and 05:00 from 4 June 2018 to 9 June 2018. Lanes Closed : There will be one of two lanes closed.
Posted: May 25, 2018, 12:30 pm
Location : The A11 northbound between the junctions with the A1075 and the A47 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2018 to 31 May 2018. Lanes Closed : There will be one of two lanes closed.
Posted: May 25, 2018, 12:30 pm
Location : The A11 northbound between the junctions with the A1075 and the A47 . Reason : Roadworks scheme is planned. Status : Pending. Schedule : From 20:00 on 29 May 2018 to 06:00 on 23 June 2018.
Posted: May 25, 2018, 12:30 pm
Location : The A11 southbound between the junctions with the A47 and the A1075 . Lane Closures : Lane two will be closed. Reason : Roadworks are planned. Status : Pending. Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2018 to 31 May 2018. Lanes Closed : There will be one of two lanes closed.
Posted: May 25, 2018, 12:30 pm

Announcements

Breaking News: Traffic Information

Breaking News

The latest current breaking news items for England's motorway network

The M11 in Essex is experiencing long delays southbound between J10 and J8
Posted: January 1, 1970, 12:00 am
Long delays on the M5 southbound due to bank holiday getaway traffic
Posted: January 1, 1970, 12:00 am

Regional Twitter feed

Keep up-to-date

Sign up for updates
Please leave feedback